Brief Project Description
This project consisted of the concrete widening of the airfield taxiway system. The scope included minor earthwork, minor drainage, paving, airfield electrical, marking, erosion control, seeding and mulching.
The 500ā extension of the Taxiway A on the northwest end to the end of the current blast pad, widening of Taxiway A Parallel between Taxiway F (formally known as Taxiway E and Taxiway E (formerlyĀ Taxiway D), fillet widening at the northern intersection of Taxiway E (formerlyĀ Taxiway D) and Taxiway A, widening of Taxiway A Parallel between Taxiway E (formerlyĀ Taxiway D and Taxiway B (formerlyĀ Taxiway A Connector), and fillet widening of Taxiway B (formerlyĀ Taxiway A Connector on the southeast) at the intersection of Taxiway A Parallel and the intersection at the runway.