Fire Station Vehicle Exhaust System Replacement
JOC, Municipal, Transportation

Astra installed a ceiling suspended exhaust removal system and necessary circuits and wiring in three fire stations at Hartsfield-Jackson...

Port of Savannah International Multi-Modal Connector Civil Infrastructure
Infrastructure, Transportation

Astra is working to complete the civil and rail infrastructure for the Port of Savannah's International Multi-Modal Connector project. Ou...

McCollum Field North Apron Rehabilitation & Expansion
Infrastructure, Transportation

Astra performed rehabilitation and expansion services that included bituminous pavement construction, earthwork, full depth pavement remo...

Atlantic Aviation Site and Paving at DeKalb Peachtree Airport
Infrastructure, Transportation

The scope for this project included the installment of upgraded storm drainage lines, underground stormwater detention, surface water col...

DeKalb-Peachtree Airport North and Northeast Ramp Pavement Improvements
Infrastructure, Transportation

This project consisted of the rehabilitation of the existing asphalt pavement in four locations within the North and Northeast Quadrants ...

DeKalb-Peachtree Airport Runway 21L Engineered Materials Arresting System (EMAS)
Infrastructure, Transportation

Astra completed the installation of an Engineered Material Arresting System (EMAS) on the Runway 21L Approach End. The project incorporat...

Paulding County Airport
Transportation

Astra worked to widen and lengthen a taxiway at Paulding County Airport in Dallas, Georgia. The work included site improvements, grading,...

DeKalb-Peachtree Airport Westside Hangar
Infrastructure, Transportation

For this renovation at DeKalb Peachtree Airport, Astra removed the existing pavement, performed grading, installed drainage and a detenti...

North Cargo Service Road Improvements
Infrastructure, JOC, Transportation

Astra team provided labor, materials, and equipment to widen three air cargo service roads for the Tampa International Airport which incl...

Georgia Army Tactical Unmanned Aircraft System Ready Building
JOC, Military

Astra worked with Clark Patterson Lee for the design and construction of the 11,462 SF Tactical Unmanned Aircraft System (TUAS) Ready Bui...

Clay National Guard Center MEDCOM Soldier Readiness Processing Building
JOC, Military

Astra provided materials, equipment, labor, and transportation to design, furnish, and install a new pre-engineered metal building that i...

Fayetteville Fire Station #4
Infrastructure, Municipal

With the construction of Fire Station #4 for Fayetteville County underway, we have poured the concrete slab on grade, erected steel frami...

Morgan Falls Overlook Park
Infrastructure, Municipal

For this park on beautiful Bull Sluice Lake, Astra constructed new playgrounds, buildings, and hardscapes while also preserving historic ...

Ivy Creek Greenway
Infrastructure, Municipal

Ivy Creek Greenway was constructed from the ground up with a scope of work including the construction of asphalt trails, boardwalks for b...

Lillian Webb Park
Infrastructure, Municipal

The scope of Lillian Webb Park included the construction of a house with stone faced retaining walls and cascading waterfalls, other deco...

Suwanee Town Center Park
Infrastructure, Municipal

The construction of Suwanee Town Center Park included one mile of lighted paver and concrete pathways, decorative hardscapes, granite wal...

Eastside Trail
Athletic, Infrastructure, Municipal

The Eastside Trail project included the construction of a 2-mile trail through an urban residential setting, decorative concrete path, pe...

Play Chastain
Municipal

Play Chastain included the construction of new play structures, treehouse, hardscapes, and landscaping.

Airside F Sort Facility Drainage Improvements
Infrastructure, JOC, Transportation

The scope of work for the Airside F Sort Facility Drainage Improvements included demolition, grading, and installation of storm drainage ...

Capitol Square Extension
Infrastructure, Municipal, Transportation

For the Capitol Square Extension, Astra demolished the parking deck and utility bridge and extended the Square (Mitchell Street) east of ...

Savannah Gardens
Infrastructure, Municipal

Completion of the Savannah Gardens included a new storm drainage system and new water and sewer services for single family, multi-family ...

Charlie Loudermilk Park
Infrastructure, Municipal

Improvements of Charlie Loudermilk Park included the construction of a one of a kind public space that includes a clock tower, sculpture,...

Sweetwater Park
Athletic, Municipal

Construction of Sweetwater Park included the installation of 2,000 SF open-air pavilion with seating, ¾ mile multi-purpose trail, playgro...

Bradwell Institute Media Center
Education, JOC

Renovation of the Bradwell Media Center included the installation of new flooring, LED lighting, storefront glass, and repainting the walls.

Big Corkscrew Island Regional Park
Athletic, Infrastructure, JOC, Municipal

A new 59-acre regional park in Naples is currently under construction. The $46 million park includes multiple athletic fields for soccer,...

Historic Fourth Ward Park/Clear Creek Combined Sewer Basin Relief
Infrastructure, Municipal

Clear Creek is located in Historic Fourth Ward Park and includes a two-acre detention pond providing relief to the City of Atlanta’s comb...

Liberty Plaza
Infrastructure, Municipal

Astra demolished the parking deck, and using a design from Stevens & Wilkinson, constructed the beautiful plaza including granite walls, ...

Lakefield Dam Urban Watershed
Infrastructure, Municipal

Astra provided construction services for the rehabilitation of Lakefield Dam.

Fairburn Memorial Plaza
Infrastructure, Municipal

The Fairburn Plaza project included a stage, new building featuring reclaimed wood, as well as a significant amount of hardscape.

Harbins Community Park
Athletic, Infrastructure, Municipal

Astra worked with Lose & Associates on this park in Dacula to construct seven (7) baseball fields, including plazas, dugouts, fencing and...