Brief Project Description
This project consisted of the concrete widening of the airfield taxiway system. The scope included minor earthwork, minor drainage, paving, airfield electrical, marking, erosion control, seeding, and mulching.
The work encompassed the 500-foot extension of Taxiway A on the northwest end to the end of the current blast pad, widening of Taxiway A Parallel between Taxiway F (formally known as Taxiway E) and Taxiway E (formerly Taxiway D), fillet widening at the northern intersection of Taxiway E (formerly Taxiway D) and Taxiway A, widening of Taxiway A Parallel between Taxiway E (formerly Taxiway D) and Taxiway B (formerly Taxiway A Connector), and fillet widening of Taxiway B (formerly Taxiway A Connector on the southeast) at the intersection of Taxiway A Parallel and the intersection at the runway.