Brief Project Description
The project consisted of the rehabilitation of the existing asphalt pavement in four locations: adjacent to the T-hangar, within the limits of the adjacent aircraft tie-down areas, adjacent to the corporate hangars, along the main taxi-lane route accessing these hangar, and tie-down locations. The project limits encompass roughly 12 acres of paved area within the North and Northeast Quadrants of the DeKalb Peachtree Airport.



